Results for: Keeping water safe in premises

Search publications

Keeping water safe in premises

Keeping water safe in premises - WRAS policy

Water Industry policy for the enforcement of the Water Supply (Water fittings) Regulations by WRAS.

Download/View

Miscellaneous Water Charges 2024/25

Water company lay application form

Code of Practice for household customers 2023/24 - Water pipes

Water use in the home

Water reuse systems

Guidance and advice on water reuse systems provided by Water UK and the Home Builders Federation.

Download/View

Water Resources Management Plan 2019

Installing water supply pipes

Developer services info sheet 1 - requirements for installing water supply pipes.

Download/View

Replacement water supply application

Application for separation of existing shared supply or a replacement water connection.

Download/View

Water Supply (Water Fittings) Regulations 1999 - what they are and how they affect you

This leaflet by WRAS that provides information about the Water Supply (Water Fittings) Regulations and how they affect you.

Download/View

Self-laying of water mains and services

This addendum is provided for the self-laying of water mains and services in the two regions supplied by South Staffs Water (the Company).

Download/View

Water main diversion application form

If you need us to relocate our water mains to facilitate your development, you will need to apply for a water main diversion.

Download/View

SSC17 South Staffs Water: Estimates of Water Poverty

Research conducted into our regions by CEPA to determine the levels of water poverty we need to tackle.

Download/View

Code of Practice for household customers 2023/24 - Water services we provide

Notice of Application for Water Services and Sewerage Services Licences

Notice of Application for Water Services and Sewerage Services Licences.

Download/View

Our draft water resources management plan

Water fittings notification form

Use this form to notify us of a change of plumbing installation under the Water Fittings Regulation 5.

Download/View

Self-laying of water mains and services addendum

This addendum is provided for the self-laying of water mains and services in the two regions supplied by South Staffs Water (the Company).

Download/View

Revised Draft Water Resources Management Plan 2024

This plan looks at the predictions for water demand over the next 25 years, and what water supply is available to meet this demand.

Download/View

Water meter relocation policy

Moving your water meter isn’t standard DIY. This policy tells you what you need to do if you want to move your meter.

Download/View

SSC04d PR24 data tables commentary – Water resources.

A commentary on data in the ‘Water resources’ section of our data tables.

Download/View

SSC34 South Staffs water revised draft WRMP24

Our draft water resources management plan for the South Staffs region

Download/View

SSC35 Cambridge Water revised draft WRMP24

Our draft water resources management plan for the Cambridge region

Download/View

Cisterns for storing water and animal troughs

Developer services info sheet 3 - details for cisterns for storing water and animal troughs.

Download/View

Protecting and accessing water supply pipes

Developer services info sheet 2 - requirements for protecting and accessing water supply pipes.

Download/View

Superseded - Draft Water Resources Management Plan 2025 - 2050 (1)

Our superseded draft Water Resources Management Plan which looks at the predictions for water demand over the next 25 years, and what water supply is available to meet this demand.

Download/View

Superseded - Draft Water Resources Management Plan 2025 - 2050 (2)

Our superseded draft Water Resources Management Plan which looks at the predictions for water demand over the next 25 years, and what water supply is available to meet this demand.

Download/View

Superseded - Draft Water Resources Management Plan 2025 - 2050

Our superseded draft Water Resources Management Plan which looks at the predictions for water demand over the next 25 years, and what water supply is available to meet this demand.

Download/View

Water Codes for adoption - local practices; consultation document

As part the upcoming Code for Adoption changes within the water industry each water company is required to publish and consult on any local practices which they wish to use rather than or in addition to the industry-wide standard practices.

Download/View

Making water count - our plan for 2020 to 2025 appendix A49

Appendix A49 Water resources annualised unit cost mode

Download/View

RA01 - PR19 2020 to 2025 - Wholesale water base cost allowance

RA01 - PR19 2020 to 2025 - Wholesale water base cost allowance

Download/View

Water Resources Management Plan Cambridge Region - Annual Review 2017

Water Resources Management Plan Cambridge Region - Annual Review 2017

Download/View

Strategic regional water resources reconciliation model Dec 2020 v2.0

Strategic regional water resources reconciliation model Dec 2020 v2.0

Download/View

SSC04c PR24 data tables commentary – costs (wholesale) water

A commentary on data in the ‘Costs (wholesale) water’ section of our data tables.

Download/View

SSC18c – Frontier Economics Impact of Covid-19 on the water sector, December 2020

Report on the impact of Covid-19 on the water sector conducted by external company, Frontier Economics.

Download/View

Statement of final wholesale water charges and charges scheme 2020-2021

This charges scheme sets out our wholesale charges to provide water to a retailer. All charges are effective from 1 April 2020 to 31 March 2021, unless otherwise stated. Wholesale charges are the charges that retailers have to pay wholesalers for the provision of wholesale water services.

Download/View

SSC15 Your Water Your Say: You Said We Did

How feedback on our business plan gained in our ‘Your water, your say’ session has been incorporated into our final business plan.

Download/View

RA02 - PR19 2020 to 2025 - Addendum to Appendix A29 – Wholesale water enhancement cost allowance

RA02 - PR19 2020 to 2025 - Addendum to Appendix A29 – Wholesale water enhancement cost allowance

Download/View

Statement of final wholesale water charges and charges scheme 2021-2022

This charges scheme sets out our wholesale charges to provide water to a retailer. All charges are effective from 1 April 2021 to 31 March 2022, unless otherwise stated.

Download/View

RAPID - Annex C

RAPID - Annex E.1

Business Plan 2025 to 2030

Water Resources Planning Tables 2024

Barrier pipe information

Automatic Fire Sprinkler Systems

Policy for the Supply of Water to Automatic Fire Sprinkler Systems.

Download/View

Response to Household Call for Evidence

South Staffs Water's Response to Household Call for Evidence

Download/View

Wholesale charges scheme 2022/23

Statement of final wholesale water charges and charges scheme

Download/View

WRMP24 - Appendix H1

OxCam Water Resources East housing and population growth

Download/View

WRMP24 - Appendix H4

Water Resources East - Transient and hidden population

Download/View

WRMP24 - Draft WRMP WFD report

Water framework directive regulations compliance assessment report

Download/View

Appendix G - CAM Headroom Report

WRMP24 - Appendix B20

Customer Challenge Group Report

An assurance report for Our business plan provided to Ofwat by the CCG's Of South Staffs Water and Cambridge Water

Download/View

Draft WRMP 2024 Statement of Response

This plan looks at the predictions for water demand over the next 25 years, and what water supply is available to meet this demand.

Download/View

SSC31 Independent Challenge for South Staffs and Cambridge Water

A report from the chair of our Independent Challenge Group who have challenged our business plan, customer engagement and long-term delivery strategy

Download/View

Draft WRMP 2024 - Revised February 2024

A revised draft of our Water Resources Management Plan (February 2024) which looks at the predictions for water demand over the next 25 years, and what water supply is available to meet this demand.

Download/View

Draft WRMP 2024 Statement of Response - Revised February 2024

A revised statement of response to our draft Water Resources Management Plan (February 2024) which looks at the predictions for water demand over the next 25 years, and what water supply is available to meet this demand.

Download/View

Pre-development enquiry form

Use this form to enquire about the likely cost of water services for your development.

Download/View

Indicative Wholesale Charges Scheme 2021-22

Statement of indicative wholesale water charges and charges scheme 2021-2022

Download/View

Indicative Wholesale Charges Scheme 2020-21

Statement of indicative wholesale water charges and charges scheme 2020-2021

Download/View

Indicative Wholesale Charges Scheme 2019-20

Statement of indicative wholesale water charges and charges scheme 2019-20

Download/View

WRMP24 - Appendix H3

Water Resources East draft regional plan - demand forecast

Download/View

Appendix I - ValueStream Methodology Specification

Water Resources West Regional Plan decision support tool - specification note

Download/View

WRMP24 - Appendix B17

Feedback on draft WRMP 2024 from the WRAP (Water Resources Advisory Panel)

Download/View

Who's responsible leaflet

Our who's responsible leaflet explains who is responsible for water supply pipes, stops taps, water meters and sewerage and drainage pipes.

Download/View

Customer Charges Scheme 2019/20

This Charges Scheme sets out our charges for water services and also those we collect on behalf of Anglian Water for wastewater services.

Download/View

Customer charges scheme 2021/22

This charges scheme sets out our charges for water services and also those we collect on behalf of Anglian Water for wastewater services.

Download/View

SSC32 Long-Term Delivery Strategy

Climate change impacts on raw water quality technical report. Report on the impact of climate change on raw water quality in the long term (to 2050).

Download/View

SSC06 Bidding framework

This bid assessment framework sets out guidance for third parties wishing to engage with South Staffs Water (incorporating Cambridge Water) about; providing a solution to a potential water deficit; making us aware of an innovation that will drive efficiency in the processes around producing and distributing water; making us aware of an innovation that will drive efficiency in water usage; and using our network to transport water.

Download/View

Making water count - our Business Plan for 2020 to 2025

Making water count - our plan for 2020 to 2025 appendix A43

Making water count - our plan for 2020 to 2025 appendix A51

Making water count - our plan for 2020 to 2025 appendix A50

Making water count - our plan for 2020 to 2025 appendix A47

Making water count - our plan for 2020 to 2025 appendix A44

Appendix A44 PWC retail services efficiency benchmarking

Download/View

Making water count - our plan for 2020 to 2025 appendix A38

Appendix A38 Board assurance of our PR19 business plan

Download/View

Making water count - our plan for 2020 to 2025 appendix A37

Appendix A37 WISER submission response (South Staffs incorporating Cambridge)

Download/View

Making water count - our plan for 2020 to 2025 appendix A36

Making water count - our plan for 2020 to 2025 appendix A35

Making water count - our plan for 2020 to 2025 appendix A33.8

Appendix A33.8 Cost adjustment claim proposed delivery timeline

Download/View

Making water count - our plan for 2020 to 2025 appendix A33.6

Appendix A33.6 Explain market research cost adjustment claim enagagement report

Download/View

Making water count - our plan for 2020 to 2025 appendix A33.5.3

Making water count - our plan for 2020 to 2025 appendix A33.4

Making water count - our plan for 2020 to 2025 appendix A33.3

Appendix A33.3 Decision making framework model summary

Download/View

Making water count - our plan for 2020 to 2025 appendix A33.1.2

Making water count - our plan for 2020 to 2025 appendix A33.1

Making water count - our plan for 2020 to 2025 appendix A33

Making water count - our plan for 2020 to 2025 appendix A32.2

Making water count - our plan for 2020 to 2025 appendix A32.1

Making water count - our plan for 2020 to 2025 appendix A31

Making water count - our plan for 2020 to 2025 appendix A30

Making water count - our plan for 2020 to 2025 appendix A29

Appendix A29 Capital investment to deliver a class-leading service

Download/View

Making water count - our plan for 2020 to 2025 appendix A28

Making water count - our plan for 2020 to 2025 appendix A27

Making water count - our plan for 2020 to 2025 appendix A26

Making water count - our plan for 2020 to 2025 appendix A25.3

Appendix A25.3 Triangulation Peer Review of Report - Giles Atkinson with PJM Final Response

Download/View

Making water count - our plan for 2020 to 2025 appendix A25.2

Appendix A25.2 Triangulation Peer Review of Approach - Giles Atkinson

Download/View

Making water count - our plan for 2020 to 2025 appendix A25.1

Appendix A25.1 PR19 WRMP and WTP data triangulation sheet

Download/View

Making water count - our plan for 2020 to 2025 appendix A25

Appendix A25 PR19 WRMP and WTP data triangulation study

Download/View

Making water count - our plan for 2020 to 2025 appendix A18

Appendix A18 New connections market customer engagement

Download/View

Making water count - our plan for 2020 to 2025 appendix A14.2

Making water count - our plan for 2020 to 2025 appendix A14.1

Making water count - our plan for 2020 to 2025 appendix A14

Making water count - our plan for 2020 to 2025 appendix A13.2

Making water count - our plan for 2020 to 2025 appendix A13.1

Appendix A13.1 SSC Peer Review WtP Research Methodology by Ariel Bergmann

Download/View

Making water count - our plan for 2020 to 2025 appendix A13

Making water count - our plan for 2020 to 2025 appendix A05

Making water count - our plan for 2020 to 2025 appendix A08

Making water count - our plan for 2020 to 2025 appendix A07

Making water count - our plan for 2020 to 2025 appendix A06

Making water count - our plan for 2020 to 2025 appendix A03

Making water count - our plan for 2020 to 2025 appendix A02

Making water count - our plan for 2020 to 2025 appendix A01

Making Water Count - our plan for 2020 to 2025 - September 2018

Our draft water resources management plan - customer summary

Code of Practice for household customers 2023/24 - Water charges and bills

Our policy on charging and the scale of charges payable within the year

Download/View

Customer charges scheme 2020/21

This charges scheme sets out our charges for water services and also those we collect on behalf of Anglian Water for wastewater services. This scheme comes into effect on 1 April 2020.

Download/View

Customer Charges Scheme 2023-2024

This charges scheme sets out our charges for water services and also those we collect on behalf of Anglian Water for wastewater services, with effect from 1 April 2023.

Download/View

SSC03 Fens Reservoir – our approach into AMP8

Our supporting information behind our plan to build a reservoir in the Fens in Cambridge with Anglian Water.

Download/View

Developer Service Charges 2019-2020

This document sets out and defines the way South Staffs Water (incorporating Cambridge Water) will charge developers for everything associated with new developments and new connections to our network. These charges cover the period from 1 April 2019 to 31 March 2020.

Download/View

Wholesale - non-primary charges 2020-21

This document outlines the non-primary charges for use by licensed retailers in connection with services requested from South Staffs Water in support of the competitive retail market.

Download/View

Wholesale non-primary charges 2019 - 2020

This document outlines the non-primary charges for use by licensed retailers in connection with services requested from South Staffs Water in support of the competitive retail market.

Download/View

Statement of significant change to wholesale charges 2020-21

Under the wholesale charges scheme rules issued by the Water Services Regulation Authority (Ofwat), the Company is required to provide a statement summarising significant changes to 2020-21 wholesale charges.

Download/View

Wholesale Charges Scheme 2019-20

This charges scheme sets out our wholesale charges to provide water to a retailer. All charges are effective from 1 April 2019 to 31 March 2020, unless otherwise stated.

Download/View

Alternative credit support agreement

An agreement for alternative eligible credit support arrangement pursuant to Schedule 3 of the Business Terms contained within the Wholesale Contract dated 20th November 2017 and made under section 66E or section 117E of the Water Industry Act.

Download/View

Service connections user guide

This guide explains the process, timeframes, costs and relevant information that developer customers need to make a new service connection. A service connection is typically a small diameter (25mm) pipe which connects the supply from a property into the existing network of a water company.

Download/View